Maintenance forecast
Calendar deadlines are fixed dates. Usage items are due at a meter value — the dates beside them are estimates.
Aero Center organizes recorded deadlines and projects usage-based items from recorded utilization. It does not determine airworthiness, approve a return to service, or replace the maintenance records. The owner, operator and authorized maintenance personnel remain responsible.
Aircraft
Estimate usage from
Changing the basis only changes the estimated dates for usage items. It never moves a calendar deadline.
Recorded deadline exceeded (1)
Blocks dispatch when reached (1)
Due soon (2)
Approaching (4)
Planned (2)
Recorded meters
N814CD
Cirrus SR20
- Tach
- 2310.6
- Hobbs
- 2325.8
- Airframe
- 2401.3
- Used, last 30 days
- 0.80 hr/day
- Booked ahead
- 6.5 hr / 21 days
Read 18 Sep 2026 · 09:15 local
N4521P
Piper Archer II
- Tach
- 7180.9
- Hobbs
- 7192.4
- Airframe
- 7402.1
- Used, last 30 days
- 1.40 hr/day
- Booked ahead
- 18 hr / 21 days
Read 19 Sep 2026 · 12:05 local
N172SP
Cessna 172SP Skyhawk
- Tach
- 4467.4
- Hobbs
- 4471.2
- Airframe
- 4712.9
- Used, last 30 days
- 2.40 hr/day
- Booked ahead
- 34.5 hr / 21 days
Read 19 Sep 2026 · 16:40 local